#3675 Gateway Knowledge Graph; +Documents; +Hazard Reports

#3675 Gateway Knowledge Graph

#3675 I have a NASA Gateway knowledge graph with fake documents attached to Gateway major Elements (PPE, HALO, etc.) and systems. RAG queries on the knowledge graph with document embeddings works. Think innovatively. List 10 unique activities to explore with this knowledge graph

Of course. Here are 10 unique activities to explore with your NASA Gateway knowledge graph, moving beyond standard Q&A to leverage the unique combination of graph structure and document embeddings.

1. Cascading Failure Simulation

Instead of asking what a component does, ask what happens when it breaks.

  • Activity: A user specifies a failure in a single node (e.g., "A micrometeoroid strike disables a solar panel on the PPE"). The system would then:

    1. Traverse the knowledge graph to identify all directly connected systems that depend on that solar panel's power.

    2. For each dependent system, use RAG to query its documentation with prompts like, "What are the operational impacts of a 25% reduction in primary power?"

    3. Synthesize the results to predict a chain reaction, generating a narrative like: "A PPE solar panel failure would reduce HALO's power reserves, forcing non-essential science payloads offline and putting a greater load on the station's backup batteries."


2. Semantic Anomaly Detection

Use the graph's structure to find documentation that seems "out of place."

  • Activity: The system can analyze the document embeddings for all nodes within a specific subsystem (e.g., all components of the HALO life support system). It would then flag any document whose semantic content is a statistical outlier compared to its neighbors.

  • Example: If a document attached to a CO₂ scrubber contains language semantically closer to documents about propulsion systems, it could indicate a misfiled report, an incorrect link in the knowledge graph, or a critical but non-obvious interdependency.


3. Mission Checklist and Procedure Generation

Generate novel operational artifacts from scattered information.

  • Activity: A user provides a high-level goal, such as "Prepare the I-HAB module for Orion docking." The system identifies the relevant subgraph (I-HAB, Orion, docking adapters, etc.), retrieves all associated operational procedures via RAG, and then uses the LLM to synthesize a new, step-by-step checklist, logically ordering the actions based on the combined knowledge.


4. Cross-System Design Pattern Analysis

Identify and compare how different parts of the Gateway solve similar engineering problems.

  • Activity: A user asks, "Compare the thermal regulation strategies of the PPE and the HALO module." The system identifies the nodes corresponding to the thermal control systems for both elements. It then retrieves their design documents and specifications and instructs the LLM to perform a comparative analysis, highlighting similarities, differences, and potential advantages of each approach.


5. "What If" Environmental Modeling

Turn the static knowledge graph into an interactive model.

  • Activity: A user can modify a global variable, like "Increase solar radiation levels by 40%." The system identifies all externally-facing components, queries their documentation for radiation tolerance and performance impacts, and generates a summary of potential effects across the entire station, such as degradation of solar arrays or increased error rates in specific avionics.


6. Socratic Tutor for Astronaut Training

Create an interactive learning tool that teaches by asking questions.

  • Activity: A trainee asks to learn about the Gateway's communication systems. Instead of just listing facts, the system retrieves the core information and formulates a question: "The Gateway will use both S-band and K-band frequencies. Given the distance to the moon, what do you think is the primary purpose of each?" The system then uses its knowledge to validate the trainee's answer and guide them through the material.


7. Scientific Payload Integration Assistant

Simulate the impact of adding new hardware to the Gateway.

  • Activity: A scientist inputs the requirements for a new external experiment (power draw, data bandwidth, thermal load, desired location). The system "tentatively" adds this payload to the knowledge graph and runs an automated impact analysis, querying connected systems to flag potential bottlenecks, resource conflicts, or required upgrades before the hardware is even built.


8. Automated Contradiction Detection

Audit the documentation for inconsistencies, a critical task in complex engineering projects.

  • Activity: The system focuses on a single critical parameter, like "maximum internal pressure of the HALO module." It performs a broad search for this term across all documents, retrieves every relevant statement, and then prompts the LLM to "Identify any contradictions, inconsistent values, or outdated specifications in the following data, citing the source document for each claim."


9. Technology Obsolescence Forecaster

Proactively identify components at risk of becoming outdated.

  • Activity: The system extracts specific component names and models (e.g., FPGA models, battery chemistries) from the documents. It can then cross-reference these with external data sources (or a simulated future timeline) to identify technologies that are nearing their end-of-life. This generates a "risk report" highlighting which Gateway systems rely on aging technology that could impact future mission extensions.


10. Abstractive Summarization for Different Audiences

Generate new content by changing the level of technical abstraction.

  • Activity: A user selects a complex procedure, like the installation of the Canadarm3 robotic arm. The system retrieves all the highly technical engineering documents and assembly guides. The user can then request summaries for different audiences:

    • "For an executive": A one-paragraph summary focusing on mission capabilities and timeline.

    • "For a press release": An exciting, easy-to-understand narrative for the public.

    • "For a new engineer": A concise technical overview without the minute implementation details.


What real NASA documents should be added to this knowledge graph at the program, element, system and subsystems levels?

Excellent question. Populating the knowledge graph with real documents is the critical next step to making it a truly powerful tool. The key is to select documents that define requirements, interfaces, and operations, as these naturally populate the nodes and edges of a graph.

Here is a breakdown of the types of real NASA (and international partner) documents you should add, categorized by the specified levels.

1. Program Level

At the highest level, you need documents that govern the entire Gateway program, define its purpose, and establish its top-level requirements and international agreements.

  • Document Types: Program Plans, System Requirements Documents, Concept of Operations, and International Agreements.

  • Purpose: These documents establish the "why" and "what" for the entire Gateway. They are the foundational texts from which all other requirements flow down.

  • Real Document Examples:

    • Gateway Program System Requirements Document (SRD): This is a cornerstone document (publicly available on the NASA Technical Reports Server - NTRS) that defines the top-level functional and performance requirements for the entire Gateway. It's essential for the root nodes of your graph.

    • Gateway Concept of Operations (ConOps): This document describes how the Gateway will be used mission by mission. It details mission phases, crew activities, and operational philosophies, providing crucial context for how elements and systems will interact over time.

    • NASA-ESA/JAXA/CSA Memoranda of Understanding (MOU): These high-level agreements define the roles, responsibilities, and contributions of each international partner. They are critical for understanding the origin and ownership of different Gateway elements.

    • Gateway Program Human-Systems Integration (HSI) Architecture Definition Document: This governs requirements related to crew health, safety, and performance across the entire station.


2. Element Level

This level focuses on the major, physically distinct modules of the Gateway. The most important documents here are those that define what the element is and how it connects to others.

  • Document Types: Element-Specific Specifications and, most critically, Interface Control Documents (ICDs).

  • Purpose: These documents define the form, fit, and function of a specific module (like PPE or HALO) and precisely detail the physical, electrical, data, and thermal connections between it and its neighboring elements. ICDs are the blueprint for the "edges" in your knowledge graph.

  • Real Document Examples:

    • Power and Propulsion Element (PPE) to Habitation and Logistics Outpost (HALO) ICD: This is one of the most critical ICDs, defining the primary structural and resource connection that forms the initial Gateway. It specifies everything from the physical docking mechanism to the power and data pinouts in the connection.

    • HALO to Orion Interface Definition Document (IDD): Defines the requirements for the docking system that the Orion spacecraft will use to connect to HALO, including docking loads, communication protocols, and crew transfer procedures.

    • International Habitation Module (I-HAB) System Requirements Document: The ESA/JAXA-led specification that defines the capabilities of the I-HAB module, including its life support contributions and scientific facilities.

    • Deep Space Logistics (DSL) Program Gateway Logistics Services (GLS) User's Guide: This would function as the guide for the Dragon XL cargo vehicle, defining its cargo capacity, delivery interface, and operational constraints.


3. System Level

This level is for functional systems that often span multiple elements. Documents here describe the end-to-end architecture of a particular function, like power distribution or data management.

  • Document Types: Architecture Definition Documents, System Specifications, and Standards.

  • Purpose: These documents provide a holistic view of a single, station-wide function. They are perfect for linking various subsystems across different elements into a cohesive functional group.

  • Real Document Examples:

    • Gateway Command & Data Handling (C&DH) Architecture Document: Describes the station's entire data network, including the use of Time-Triggered Ethernet (TTE), data storage policies, and uplink/downlink management.

    • Gateway Electrical Power System (EPS) Specification: Details the station-wide power architecture, including voltage standards for the high-power buses, battery management strategies, and power quality requirements for all connected modules and payloads.

    • Gateway Visiting Vehicle Integration Plan: A document that standardizes the process and requirements for any vehicle (Orion, landers, logistics) to approach, dock with, and depart from the Gateway.

    • Gateway Robotics System (Canadarm3) Operations Concept: Describes how the Canadian-built robotic system will be commanded, its primary tasks (inspection, maintenance, payload handling), and its interfaces with the rest of the station.


4. Subsystem and Component Level

This is the most granular level, containing the detailed design, analysis, and test data for individual pieces of hardware.

  • Document Types: Design Reports, Analysis Reports, Test Plans & Results, and Failure Modes & Effects Analyses (FMEAs).

  • Purpose: These documents contain the "ground truth" about how specific hardware is designed, what its performance limits are, and how it's expected to fail. This is the data needed for deep, analytical queries.

  • Real Document Examples:

    • Advanced Electric Propulsion System (AEPS) Thruster Qualification Test Report: Detailed performance data from the ground testing of the Hall-effect thrusters used on the PPE.

    • HALO Primary Structure Finite Element Analysis (FEA) Report: The structural analysis model and results that verify the HALO module can withstand launch and operational loads.

    • Environmental Control and Life Support System (ECLSS) CO₂ Scrubber FMEA/FMECA: A safety and reliability document that systematically analyzes every potential failure mode of the carbon dioxide removal system, its causes, and its effects on the crew and station.

    • Gateway Roll-Out Solar Array (ROSA) Deployment Test Procedure: The step-by-step plan for testing the deployment of the large, flexible solar arrays used on the PPE, including success criteria and contingency plans.

By incorporating these specific and varied types of documents, your knowledge graph will evolve from a simple inventory of parts into a rich, multi-layered model of the Gateway's design, operation, and interdependencies.


Describe the contents of a NASA software hazard report

A NASA software hazard report is a formal document that meticulously details a potential hazard related to software, its causes, its potential consequences, and the measures taken to mitigate the associated risk. It's a critical component of the overall system safety process, especially for mission-critical systems where a software failure could lead to catastrophic outcomes.

Guided by standards like NASA-STD-8739.8 "Software Assurance and Software Safety Standard" and the accompanying NASA-GB-8719.13 "Software Safety Guidebook," these reports provide a structured way to analyze and manage software risks. While the exact format can vary by project, every report contains the same core elements.

Here's a breakdown of the typical contents of a NASA software hazard report:

## 1. Hazard Identification and Description

This section serves as the introduction to the potential issue.

  • Hazard Title: A clear and concise name for the hazard (e.g., "Uncommanded Thruster Firing," "Loss of Telemetry Data During Critical Maneuver").

  • System and Subsystem: Identifies the specific system (e.g., Guidance, Navigation, and Control) and the software components involved.

  • Hazardous Condition: A detailed description of the potential unsafe state or event. It explains what could go wrong if the hazard were to occur.

  • Mission Phase: Specifies when the hazard is a concern (e.g., pre-launch, ascent, on-orbit operations, landing).

## 2. Causal Analysis

This is the investigative portion of the report, drilling down into the "why" and "how" the hazard could occur.

  • Hazard Causes: A list of all credible software-related causes that could lead to the hazardous condition. This can include:

    • Software defects: Bugs in the code, logic errors, or incorrect implementation of requirements.

    • System interactions: Unexpected interactions with other software or hardware components.

    • Off-nominal conditions: Failure to handle unexpected inputs, sensor failures, or environmental conditions.

    • Human-computer interaction: Flaws in the user interface that could lead to operator error.

  • Assumptions and Conditions: Documents any specific conditions that must be present for the hazard to manifest.

## 3. Risk Assessment

This section quantifies the severity and likelihood of the hazard to determine the overall risk.

  • Worst-Case Mishap/Effect: Describes the most severe potential outcome if the hazard is not controlled (e.g., loss of crew, loss of mission, destruction of vehicle).

  • Severity Assessment: The hazard is assigned a severity category, typically ranging from Catastrophic to Negligible.

  • Likelihood Assessment: The probability of the hazard occurring is estimated, with categories such as Probable, Occasional, or Improbable.

  • Risk Index/Matrix: Using a risk matrix, the severity and likelihood are combined to produce a Risk Index (e.g., High, Medium, Low). This index helps to prioritize which hazards require the most urgent attention.

## 4. Hazard Controls and Mitigation

This is the action-oriented part of the report, detailing the plan to reduce the risk to an acceptable level.

  • Hazard Controls: A detailed list of specific design features, safety mechanisms, or procedures put in place to prevent the hazard from occurring or to mitigate its effects. These can include:

    • Software Controls: Redundancy, fault tolerance, error detection and correction, and "safe modes."

    • Hardware Controls: Physical interlocks or redundant hardware that can override software commands.

    • Operational Controls: Specific procedures that flight controllers or astronauts must follow.

  • Verification and Validation: A crucial section that describes how each control will be tested, analyzed, or inspected to prove that it is implemented correctly and is effective. This provides the evidence that the mitigation strategy works.

## 5. Residual Risk and Acceptance

This final section documents the outcome of the analysis and the formal decision-making process.

  • Residual Risk: An assessment of the risk that remains after all the controls have been implemented and verified.

  • Acceptance Rationale: A justification for why the residual risk is considered acceptable. This is a critical step, as it formally documents the decision to proceed.

  • Signatures: The report is signed by various levels of management, indicating their review and formal acceptance of any residual risk.

In essence, a NASA software hazard report is a comprehensive narrative that tells the complete story of a potential software-related danger, from its theoretical possibility to its ultimate control and acceptance.


How could the addition of software hazard reports to the Gateway knowledge graph be useful?

Adding software hazard reports to the Gateway knowledge graph would be incredibly useful by transforming it from a simple inventory of components into a dynamic, system-wide safety and risk model. It would allow engineers and mission planners to move beyond just asking "what is this part?" to asking "what happens if this part's software fails?"


## Enhanced Risk Analysis

Connecting software hazards directly to their associated hardware, systems, and operational procedures in the graph allows for powerful new types of analysis. Instead of searching for individual reports, you could run complex queries to visualize risk relationships across the entire station.

  • Cascading Failure Prediction: By linking a "Loss of Attitude Control Software" hazard to the flight computers (hardware), the PPE thrusters (subsystems), and the "Docking Maneuver" (operational phase), you can instantly trace all potential downstream effects of that single software failure. ๐Ÿ˜ณ

  • Identifying "Hot Spots": You could query the graph to find which hardware components are associated with the highest number of catastrophic software hazards. This would immediately highlight critical components that might need more robust software verification or hardware redundancy.


## Automated Impact Assessment

The knowledge graph would make it much easier to understand the ripple effects of any proposed change.

  • Software Updates: Before deploying a software patch to the HALO module's life support system, you could query the graph to see every hazard control and safety interlock linked to that specific software module. This would automatically generate a list of all safety features that need to be re-verified, ensuring that a fix for one problem doesn't inadvertently create another. ✅

  • Hardware Changes: If a specific model of onboard computer is being replaced, the graph could instantly identify all software hazard reports that list "Hardware Failure" of that computer as a potential cause. This ensures the safety team assesses whether the new hardware is susceptible to the same failure modes.


## Streamlined Safety Reviews

Safety reviews often involve manually cross-referencing dozens of documents. A knowledge graph with hazard reports automates this process.

  • Verifying Hazard Controls: A key part of a hazard report is the hazard control and its verification. In the graph, a hazard control (e.g., "Redundant sensor cross-check algorithm") can be directly linked to the software requirement that defines it and the test report that verifies it. This creates a "golden thread" of evidence that is easily auditable. ๐Ÿงต

  • "What-If" Scenarios: Planners could simulate scenarios by "disabling" a specific control in the graph and observing which hazards are no longer mitigated. For example, "Show me all high-risk hazards if we lose telemetry from the Orion docking camera."

By integrating these reports, the knowledge graph becomes a living safety model of the Gateway, enabling a proactive, data-driven approach to mission assurance that is far more powerful than static documents alone.


Describe in detail how Streamlined Safety Reviews might be carried out using this knowledge graph with embedded software hazard reports

Of course. Here's a detailed description of how a streamlined safety review could be conducted using a Gateway knowledge graph embedded with software hazard reports.

The traditional safety review is a labor-intensive process, requiring engineers to manually hunt down and cross-reference dozens, if not hundreds, of documents stored in different systems—requirements in one database, hazard analyses in another, and test results in a third. The knowledge graph transforms this into a dynamic, integrated, and far more efficient process.


## Phase 1: Pre-Review Preparation & Scope Definition

The process begins with the safety engineer defining the review's scope directly within the knowledge graph's query interface. Instead of writing a text-based plan, they use the graph to create a live, data-driven scope.

Let's say the review is for an upcoming software patch to the HALO module's Environmental Control and Life Support System (ECLSS). The engineer would:

  1. Select the Core Node: They start by selecting the "HALO ECLSS Software v2.1" node in the graph.

  2. Define the Boundary: They run a query to automatically expand the selection to include all directly connected nodes. This immediately pulls in:

    • Hardware: The specific CO₂ scrubbers, oxygen tanks, and atmospheric sensors controlled by the software.

    • Upstream/Downstream Systems: The Gateway's main Command & Data Handling (C&DH) system (which provides data to ECLSS) and the Power Distribution System (which powers it).

    • Operational Phases: All mission phases where the HALO ECLSS is active, such as "Crewed Operations" or "Emergency Depressurization Response."

The output isn't a list of documents; it's a highlighted, interactive subgraph. This subgraph is the review's scope, ensuring no relevant component is overlooked from the very beginning.


## Phase 2: Automated Evidence Compilation

This is where the most significant time savings occur. The engineer executes a "Safety Review Package" query on the scoped subgraph. The graph traverses all connections and automatically compiles a complete evidence package.

For every software hazard report linked within the scope, the query automatically follows the graph's edges to pull in and link:

  • Hazard → Cause → Control → Requirement → Verification

    1. It retrieves the Hazard Report itself (e.g., "HR-78: Inaccurate O₂ Reading").

    2. It follows the "caused by" edge to the specific Software Failure Mode (e.g., "Floating Point Calculation Error in Sensor Data Parsing Algorithm").

    3. It then follows the "is mitigated by" edge to the Hazard Control (e.g., "Implement Redundant Sensor Cross-Check and Voting Logic").

    4. Next, it follows the "is defined by" edge to the Software Requirement (e.g., "SWE-1138: The ECLSS software shall validate O₂ sensor readings from at least two independent sources before updating the cabin atmosphere display").

    5. Finally, it follows the "is verified by" edge to the specific Test Case (e.g., "TC-4512: Verify O₂ voting logic by injecting simulated divergent sensor data") and its associated Test Report showing a "Pass" status.

This creates a "golden thread" of traceability for every single hazard in seconds, a task that would normally take a team of engineers days or weeks to compile manually.


## Phase 3: Interactive Hazard & Control Analysis

During the actual review meeting, the team doesn't look at a stack of PDFs. They have the knowledge graph projected on a screen. This allows for a dynamic, interactive analysis.

  • Visualizing Dependencies: The safety lead can click on a single hazard control, like the "Redundant Sensor Cross-Check," and the graph will instantly highlight every single hazard across the entire station that relies on that one piece of code to be safe. This visual representation makes it immediately obvious if a single point of failure exists in their safety design.

  • Drilling Down for Details: If a board member questions a specific control, the engineer can click on the "Test Report" node and instantly bring up the full results, including the date it was run, the software build it was tested on, and the engineer who signed off on it. There's no need to "get back to them" with the information.

  • Gap Analysis: The team can run a query to find any "dangling" nodes. For example, "Show me all Hazard Controls that do not have a linked Verification Test Report." This is a powerful, automated way to find gaps in the safety case that are often missed in manual reviews.


## Phase 4: "What-If" Scenario Modeling

The review moves beyond analyzing the current design to simulating potential future failures.

The safety engineer can temporarily modify the state of nodes in the graph to conduct "what-if" analyses. For instance:

  • Simulated Control Failure: The engineer can right-click the "Redundant Sensor Cross-Check" control node and set its status to "Disabled (Simulated)." They then run a query: "Display all hazards that are now unmitigated." The graph would instantly highlight "HR-78: Inaccurate O₂ Reading," showing the direct consequence of this failure.

  • Impact of External Events: They could simulate an external event, like "Loss of Main Power Bus B," by disabling that node. Another query, "Show all software hazard controls that now have a degraded power source," would reveal which safety features might not function as expected during that power outage.


## Phase 5: Automated Reporting & Action Item Tracking

The review's output is generated directly from the graph.

  • Automated Report Generation: At the end of the meeting, a script is run that summarizes the findings. It lists all reviewed hazards, the status of their controls and verifications, and the results of any "what-if" scenarios. The report is automatically generated and linked to the "ECLSS Software v2.1 Review" event node in the graph.

  • Action Item Tracking: When a potential issue is found, a new "Action Item" node is created directly in the graph and linked to the relevant component. For example, an action item like "AI-2025-09-01: Re-run verification test TC-4512 on new hardware" is linked to the test case and assigned to a specific engineer. The status of this action item remains visible in the graph for all stakeholders to track until it is closed.

By using the knowledge graph, the streamlined safety review becomes a continuous, data-driven process rather than a periodic, document-centric event. It enhances rigor, eliminates manual drudgery, and provides a far deeper understanding of the complex interplay of risks in the system. ๐Ÿš€


From <https://gemini.google.com/app/>  Google Gemini 2.5 Pro