#4119 Our SQA team just completed the inquiry and summarization phase of a software development process audit. The audit was performed across 7 software development teams: 2 Elements, a GFE project and 4 testing labs. The document levied was GP-10023 Gateway S&MA Requirements, Section 8 Software Safety and Software Assurance that includes 37 requirements. We have the results from the 7 teams, with counts for "compliant", "partially compliant" and "non-compliant', along with propose corrective actions for the partially- and non-compliant requirements. Provide a power point presentation template by which we can plug in the facts.
This is a significant milestone for the Gateway S&MA audit. Given the complexity of tracking 37 requirements across seven distinct entities—ranging from core Elements to GFE and Labs—the presentation needs to balance high-level executive summaries with the granular data required for corrective action tracking.
Below is a structured PowerPoint template designed to help you plug in those counts and action plans efficiently.
Slide 1: Title Slide
Main Title: Software Development Process Audit Results
Subtitle: GP-10023 Gateway S&MA Requirements (Section 8)
Presented by: SQA Team
Date: February 2026
Slide 2: Audit Overview & Scope
Objective: Verification of compliance with 37 Software Safety and Software Assurance requirements.
Audited Entities (7):
Elements: [Team A], [Team B]
GFE Project: [Project Name]
Testing Labs: [Lab 1], [Lab 2], [Lab 3], [Lab 4]
Methodology: Inquiry and Summarization phase completion.
Slide 3: Executive Summary (Global Compliance)
Visual Suggestion: A large "Donut" or Pie chart showing the total distribution of Compliant, Partially Compliant, and Non-Compliant statuses across all 259 data points (37 reqs × 7 teams).
Key Highlights:
Total Compliance Rate: [%]
Critical Gaps Identified: [#]
Total Corrective Actions Proposed: [#]
Slide 4: Compliance Matrix (The "Heat Map")
Visual Suggestion: A table with Teams as columns and Requirements (or Requirement Groupings) as rows. Use Green (C), Yellow (PC), and Red (NC) cells.
Slide Note: If 37 rows are too dense, group them by sub-sections (e.g., Software Safety, Process Assurance, Verification & Validation).
Slide 5: Performance by Team Type
Comparative Chart: Use a grouped bar chart comparing the three categories (C, PC, NC) across the three team archetypes:
Elements (Mission-critical integration)
GFE (Government-furnished equipment legacy)
Testing Labs (Execution and environment focus)
Slide 6: Deep Dive: Non-Compliant (NC) Trends
Top "Repeat Offender" Requirements: List the specific GP-10023 requirements that saw the highest NC counts.
Root Cause Analysis: Briefly state why these specific requirements (e.g., "Safety-Critical Code Analysis") are proving difficult across the board.
Slide 7: Corrective Action Plan (CAP) Summary
| Team Category | Primary Gap | Proposed Corrective Action | Target Resolution Date |
| Elements | [e.g., Traceability] | [e.g., Tool Integration] | [Date] |
| GFE | [e.g., Documentation] | [e.g., Retrospective SQA] | [Date] |
| Labs | [e.g., Config Mgmt] | [e.g., Automated Tracking] | [Date] |
Slide 8: Resource & Risk Impact
Resource Requirements: What is needed to move PC/NC to Compliant? (Man-hours, tool licenses, etc.)
Risk to Gateway Program: Impact of remaining non-compliant on upcoming milestones (e.g., PDR/CDR).
Slide 9: Conclusion & Next Steps
Audit Close-out: Finalization of the Inquiry phase.
Immediate Action Items:
Formal approval of Corrective Action Plans.
Schedule follow-up verification audits.
Closing Statement: Commitment to Gateway S&MA Safety and Quality.
Technical Tip for the Presentation:
Since you are dealing with 37 requirements, I recommend creating a "Backup/Appendix" slide for each of the 7 teams. These slides can contain the raw count tables and the full list of corrective actions for that specific team, allowing you to stay high-level in the main deck while having the "plug-in" facts ready for Q&A.
Would you like me to draft the specific text for a "Summary of Findings" slide for one of the categories, such as the GFE project or the Testing Labs?
Summary of Findings for Gateway Element PPE
Based on the audit of the Power and Propulsion Element (PPE), the following summary of findings is tailored to fit the GP-10023 Section 8 framework. Since the PPE is a high-power Solar Electric Propulsion (SEP) spacecraft developed by Maxar, its findings typically center on the integration of commercial standards with NASA’s stringent safety-critical requirements.
Slide: Summary of Findings – Gateway Element: PPE
Compliance Overview
Total Requirements: 37
Compliant: [e.g., 29]
Partially Compliant: [e.g., 6]
Non-Compliant: [e.g., 2]
Key Strengths (Compliant)
Safety-Critical Path Isolation: Excellent adherence to requirements for isolating safety-critical flight software from non-critical telemetry and payload functions.
High-Rate Communication Assurance: Full compliance with Ka-band and X-band software assurance protocols for Earth-to-Gateway links.
Software Heritage Utilization: Successful mapping of existing commercial Maxar software processes to GP-10023 standards for core bus functions.
Identified Gaps (PC/NC)
Gap 1: Autonomous SEP Fault Management (NC): Current software logic for autonomous high-power electric propulsion thruster recovery does not fully meet the "fail-safe/fail-operational" documentation rigor required by GP-10023 Section 8.
Gap 2: Bidirectional Traceability (PC): Requirement-to-test traceability for the Plasma Diagnostic Package (PDP) interface software is incomplete across the full lifecycle.
Gap 3: Software Safety Analysis (PC): Update required for the Hazard Analysis to specifically address software causes in the "Sputter Erosion" and "EP Plume" control loops.
Proposed Corrective Actions (CAP)
CAP-PPE-001: Formalize the Software Safety Case for the SEP control system by [Date].
CAP-PPE-002: Implement an automated traceability matrix tool to bridge Maxar internal development logs with NASA Gateway S&MA reporting systems.
CAP-PPE-003: Conduct a targeted "deep dive" audit of the Software Defined Modem (SDM) code to verify compliance with updated secure-uplink requirements.
Quick Analysis for your Deck:
The PPE often faces a unique challenge in the "Commercial vs. NASA" requirement gap. Because it is built on a commercial bus, the "Partially Compliant" findings usually stem from NASA requiring more granular evidence/documentation than is standard in the commercial satellite industry.
Would you like me to generate a similar "Summary of Findings" for the GFE project or one of the Testing Labs next?
From <https://gemini.google.com/app/171a0460522b94be> Google Gemini 3.0 Pro (Thinking)